Steel Storage Group  •  Australasia  •  Europe  •  Asia  •  Middle East
France Italy
Spain UK
Secur Drive thru - Sylt Island, Germany

Project Overview

Project type: Drive through

Design, Consultation & Materials

Client
Secur GmbH

Site Sylt Island, Germany

Site Specs
Gross Floor Area: 9410 m2
Net Lettable Area: 5,792m2
Number of units: 800
Stages: 3

Processes handled by Steel Storage
Facility design layout
Consultant co-ordination
Internal high partitioning
Gloss White hallway panelling

Special Features Designed in consultation with the clients architect to optimise the layout. There is a Drive Through on the Ground floor with extra wide corridors to allow 2 vehicles to pass in a one way system. Access to the basement, 1st floor and 2nd floor units is via 2 large lifts in the centre of the building. Aluminium corner protectors and kicker plates were used extensively between each roller door on the Ground Floor.

Client Comment Special features of our facility include a modern ventilation and dehumidifying/desalting system. This ensures that 99% of the damp and salt from the North Sea can be removed from the air and therefore providing an excellent protection for stored items. Additionally, we have installed a high CO warning system for safety reasons in the drive through area.

Click for larger image
The empty site
 
Building up
 
Prior to fit-out
 
Taking Shape
 
Prior to fit out
 
 
The finished facility

The finished facility