Steel Storage has been both flexible and professional throughout - we would not hesitate to use them for future projects. We are delighted with the results.
Installation of a single tier mezzanine floor, 2 fire escapes staircases and 1 access staircase, fire protection to the mezzanine floor (ceilings, bulkhead and column cases), electrical contracting including lighting, emergency lighting and smoke detection and full partition fit out to both floors.







