Your Self Storage
Your Self Storage Logo
The leader in self storage design and construction

Phase 2 is at the rear of the building. This part was built on the slope of the mountain and its only access is through the main entrance on the front. Therefore, we designed a particularly wide hallway to the right of the first building to allow construction equipment access to the phase 2 site.

Trasteros de Levante - Spain

SITE SPECIFICATION

Gross floor area: (phase 1) 1,500 m2
Net lettable area: 1,044 m2
Number of units: 183
Floors: 2

PROCESSES BY STEEL STORAGE

Site analysis
Feasibility study
Facility layout
Coordination of consultants
Design and construction
Partitions
White gloss hallway panels

SPECIAL FEATURES

This project consists of 2 buildings. The height of the building at the front was 29.5 feet, which allowed the construction of a mezzanine floor. With 2 floors this made a total of 3 levels: ground floor, first and second. It was decided that the building in front would be part of phase 1 as the reception and the lift had been designed in this building, near the main entrance.